3.6 MW Gugera Hydropower Project

Scope of Work

  • Preparation and submission of SOQ.
  • Supervising Process of LOI.
  • Selection of Consultant for Feasibility Study.
  • Arrangement of financing and equity partner.
  • Preparation and Submission of Generation.
  • License and Tariff Petition in NEPRA.

Sailent Features

Description

Values

Design Discharge

142 m3/s

Gross Head

3m

Design Capacity

3.6MW

Mean Annual Energy

20.8 GWh/a

Plant Factor

67%

Turbine Type

Horizontal Kaplan

Power evacuation

Through two 11 kV TLs

Project Cost

20 Million USD