4 MW Thack Chilas Hydropower Project
Our Role
Specialized subcontractor for Design, Project Management, and Supply of E&M equipment.
Employer
Water & Power Department Gilgit.
Scope of Work
Engineering, Procurement & Construction (EPC).
Sailent Features
Description2487_4fb7eb-d1> |
Values2487_9fa89f-73> |
---|---|
Type 2487_3e0990-e1> |
Run of Nullah with Pelton Units 2487_9a3e22-82> |
Turbine Capacity 2487_be6ca4-34> |
2 x 2.12MW 2487_d5f387-01> |
Installed Capacity 2487_83754c-96> |
4MW 2487_2ef7e0-65> |
Net Head 2487_206d17-18> |
271m 2487_6d6475-92> |
Rated Discharge 2487_ddb0c4-e8> |
2×0.9m3/s 2487_82dd10-df> |