26 MW Bhimbal Katha Hydropower Project

Scope of Work

  • Preparation and submission of SOQ.
  • Supervising Process of LOI.
  • Selection of Consultant for Feasibility Study.
  • Arrangement of financing and equity partner.
  • Preparation and Submission of Generation.
  • License and Tariff Petition in NEPRA.

Sailent Features

Description

Values

Design Discharge

8 m3/s

Gross Head

395 m

Design Capacity

26 MW

Mean Annual Energy

124 GW h/a

Plant Factor

54.44 %

Turbine Type

Pelton 2

Latitude

340 51′ 10.03″

Longitude

730 35’4.62″

Similar Posts